Small Cabin

Small Cabin Forum
 - Forums - Register/Sign Up - Reply - Search - Statistics -

Small Cabin Forum / Properties / Bruce Peninsula - land clearing
<< . 1 . 2 .
Author Message
bushbunkie
Member
# Posted: 10 Jun 2019 20:34
Reply 


Sounds like you are back in business again...excellent! This will be a great summer!

Aklogcabin
Member
# Posted: 11 Jun 2019 10:37
Reply 


Trevoracus , good on you man! Now you can start talking to your neighbors about how too much government is talking away you rights. And you’re paying for it.
Anyhow, congratulations. I’m happy for you.

trevoracus
Member
# Posted: 28 Aug 2019 09:47
Reply 


So it has taken most of the summer due to life getting in the way but the little shed that was to house tools has been converted to a make shift bunkie for now.

https://youtu.be/pqfv5xlTB9o

After losing the entire 2018 to some bylaw issues I seem to almost be back on track. Now I can get back to clearing the land and ready to start to dig to get working on the big place.

Brettny
Member
# Posted: 28 Aug 2019 12:48 - Edited by: Brettny
Reply 


Your required to have an electric vehicle charger on the side of your cabin? Are you ever getting power to the property?

And i thought NY was restrictive. My town is so small they only have the county building laws. A shed before the structure was the second thing i asked them. The first was can i build on my site.

trevoracus
Member
# Posted: 28 Aug 2019 13:34
Reply 


It has to be wired for it to be added, so running the appropriate cabling and box to the outside. Like Bushbunkie you have to build it to be connection ready to the grid, even if you plan on doing your own solar/gennie thing.

I tried to get away with the shed before, knowing full well it was a risk. I lost. So I could complain and get all upset or roll with the punches and speed up some planning. Now I just hope I can show some progress before my permits "runs out" (you have a 6 month time window to show progress as per the Ontario Building Code, which means having footings dug and inspected).

Given that I am one guy doing this by myself and not a contractor building a house I may get stuck again and have to renew my permit - so next goal is to continue to clean the land.

Brettny
Member
# Posted: 28 Aug 2019 15:21
Reply 


What type of foundation?

bushbunkie
Member
# Posted: 29 Aug 2019 07:55
Reply 


Good news....no longer require electrical vehicle hook up with newest building code. With permits....we just keep renewing our electrical and building permits... doesn’t seem to be a problem. Just had my plumbing and insulation inspection finally passed after 4 years...just keep plunking away.

trevoracus
Member
# Posted: 29 Aug 2019 11:45
Reply 


It will be a block foundation.

BB - Thats good news. We will see what the next few months bring for the amount of work I can get done. And might have to bite the bullet and get some extra help to get to a point that the Township considers the process has 'started'.

trevoracus
Member
# Posted: 11 Sep 2019 13:08 - Edited by: trevoracus
Reply 


Progress is slow, but, the old' ship is shaping up. Connected the wires and gave a little home for everything this past weekend. Nice to have the old solar panel and batteries pumping out 12v led lights everywhere.

Managed to get the ceiling done, which I will say I probably should have had another set of hands to help lift things.
wires
wires
roof
roof


KelVarnsen
Member
# Posted: 11 Sep 2019 14:01
Reply 


Quoting: trevoracus
Managed to get the ceiling done


Where did you get the wood for the ceiling? It looks great. Did you apply finish yourself or did it come prefinished? My cabin is in Southern Ontario and I've been struggling to find what I want for T&G pine.

Great job!

trevoracus
Member
# Posted: 11 Sep 2019 14:31
Reply 


Thanks!

Its 5/16 t&g from the Home Depot. A bit expensive at $23 for 6 boards (about 8 ft long).

URL

Then we did a 50/50 Ceiling paint water mixture. Brushed on and rubbed off after a minute or so. I do agree it turned out quite nice with not looking too white or too much like plain pine.

The walls we are using the same wood but doing a tinted stain, this time due to the numbers we rolled it on, brushed the T&G sides and then rubbed it off.
walls
walls


trevoracus
Member
# Posted: 28 Jul 2020 23:58
Reply 


Ok. This has taken a few years and a lot of adventures but finally able to get the little bunkie finished.

The next phase of building the actual house which has begun! Thanks to all for the inspiration and help along the way here!

<< . 1 . 2 .
Your reply
Bold Style  Italic Style  Underlined Style  Thumbnail Image Link  Large Image Link  URL Link           :) ;) :-( :confused: More smilies...

» Username  » Password 
Only registered users can post here. Please enter your login/password details before posting a message, or register here first.